top of page

Testimonials

Project information

1.jpeg

Dufferin Street

London

This commercial project in London's Dufferin St. was given to us. D. Hammond was renovating a two-story office building for the project. Eleven LG Mini heat recovery VRF units were installed. The client requested that the equipment be exposed to blend in with the renovation's aesthetics. All of the insulation has to be installed inside the ductwork in order to produce this sleek industrial look. We put in a lot of effort over the 2019 holiday season to deliver the programme on schedule.

"We have worked with CCP HVAC on numerous projects over the years and we are extremely pleased with the service they provide. They are an extremally professional company to work with and always provide a very high standard of work"

Greyhound Stadium

Romford

We installed multiple air conditioning units to the bar-restaurant, judges boxes the communications room and the concourse bar. Separately, we installed the odour control system for the restaurant and fast-food outlet as well as the kitchen extraction system. The installation of the boilers for the radiator heaters and the above- and below-ground water sources for the toilets were additional plumbing tasks. We installed a custom fresh air system for the stand as well as the restaurants. An extraction system was constructed throughout the kennel block to guarantee the needs of the dogs were met. Everyone in charge of running the system received staff training after the installation.

Nick Eshelby - Coral

9463eeb1-ff59-4026-b456-c082817333e8.jpg
0000_CCPHVAC-Durbin5.jpg.jpg

Pharmaceutical 
Warehouse

Our client had to maintain a steady temperature for the goods they were producing when they relocated into a new 45000 square foot warehouse. Even the air temperature was a possible problem because of the facility's height. Our design team installed 26 no. 28 Kw ducted units and 20 no. 14 Kw ceiling cassettes to get around this problem. 31 Arius de-stratification fans were installed to provide an even dispersion of air circulation. There were 23 offices that had a mixture of wall mounted units and ceiling cassettes and a separate server room with a 100% backup system. Additionally, heat recovery ventilation systems are installed in every workplace.

“Working with CCP (HVAC) on the project made the process from start to finish very straight forward, I found working with the team very easy from the initial site meeting through to commissioning and completion. CCP (HVAC) project team were very much in tune with our specific requirements and fully understood the importance to get this right first time and they delivered on this. The level of workmanship was very high, the pride the team took in their work was excellent and clear to see on the finished products. I would have no hesitation recommending CCP (HVAC) and/or working with them on future projects, very satisfied with the company, finish product and how it performs."

Chotto Matte 

Soho

The existing restaurant in Soho, London was being refurbished by the client. Their intention was to convert the basement and then refurb ground and first floors of the building into not only a sushi restaurant but a funky night venue.We were employed to design and install new Daikin equipment for the new air conditioning and ventilation systems. In addition to this we installed new sanitary ware in the toilets, carried out all of the kitchen installation works, serviced and maintained all of the plumbing and installed the drainage throughout.

WhatsApp-Image-2022-09-01-at-10.35.41-PM-2.jpeg
  • Twitter
  • LinkedIn
  • Facebook
  • Instagram
bottom of page