top of page

Matthew Parker Street

To make room for roof repairs, we transfer the AHU to the opposite side of the roof, turned off the water supply, took out the ducting that connects it, and extend the pipe to the new location. We came back as soon as the repairs were finished to mount the AHU to the frame and install the big foot system at a distance of 500mm.

WhatsApp Image 2022-12-09 at 13.23_edited.jpg
WhatsApp Image 2022-12-09 at 13.23.54 (6).jpeg
WhatsApp Image 2022-12-09 at 13.23.54 (5).jpeg
WhatsApp Image 2022-12-09 at 13.23.54 (3).jpeg
  • Twitter
  • LinkedIn
  • Facebook
  • Instagram
bottom of page