Unit 42
The Enterprise Centre, Cranborne Road, Potters Bar, Herts, EN6 3DQ
Recent News
- Should I Sleep with AC on? May 17, 2022
- Mitsubishi Business Solutions Partner May 8, 2022
A Solution for a land locked site The problem The site was land locked and there was no suitable outside spaces to install any plant. This problem is quite common on city projects where available space is at a premium. The Solution We installed Hitachi internally mounted VRF condensing units … Read More
The site was land locked and there was no suitable outside spaces to install any plant. This problem is quite common on city projects where available space is at a premium.
We installed Hitachi internally mounted VRF condensing units ducted through the front shop grills. These condensers were then connected to ducted fan coils and both the duct and the units were exposed.
The ductwork was externally insulated and sprayed out to blend into the ceiling.
We then installed a 9 meter extract canopy complete with fire suppression and designed all of the odour control to discharge at low level and still comply with Defra.
The restaurant is now open and trading, the air conditioning and ventilation is performing extremely well.