Unit 42
The Enterprise Centre, Cranborne Road, Potters Bar, Herts, EN6 3DQ
Recent News
- Should I Sleep with AC on? May 17, 2022
- Mitsubishi Business Solutions Partner May 8, 2022
The Project A large restaurant and bar in central London The Solution The air conditioning supplied and installed was a Mitsubishi VRF heat recovery system over two floors. The condensers had to be stripped down and rebuilt on the 5thfloor. The ventilation works included the cook line canopies and due … Read More
A large restaurant and bar in central London
The air conditioning supplied and installed was a Mitsubishi VRF heat recovery system over two floors. The condensers had to be stripped down and rebuilt on the 5thfloor.
The ventilation works included the cook line canopies and due to the locality of the restaurant a high level of odour control including ESP and carbon cell filtration.
The extraction terminated on the roof so the duct work had to be fire rated and within the current legislation.
We also supplied and installed the cold rooms where food and beverages were stored.
There was a high level of filtration and odour control required and the system was designed with this in mind.
The restaurant is now open and trading and is fully compliant with the local councils guidelines.
“CCP advised on the filtration required and designed a system to make sure we complied with local council guidelines. The project was delivered on time and we look forward to our continued relationship with CCP HVAC ” Justin Green of Natural Kitchen