CCPHCAC - Case Study Featured
Romford Greyhound Stadium

The Project We were appointed by Area to be a part of the Millennium Stand refurbishment project at the Coral Romford Greyhound Stadium in Essex.   The Solution We installed multiple air conditioning units to the bar-restaurant, judges boxes the communications room and the concourse bar. Separately we installed the … Read More

CCPHVAC - Dufferin St
Dufferin St, London

The Project We were appointed this commercial project in Dufferin St, London. The project was two-storey office building which was being refurbished by D Hammond. The Solution We Installed eleven LG Mini heat recovery VRF units. The client requested the equipment to be exposed to fit in with the ascetics … Read More

CCPHVAC - Cinnamon Featured Image
Cinnamon Kitchen, Battersea

The Project The site in Battersea, London was a landlocked archway site which was being turned into an Indian restaurant.   The Solution Our solution was to install a variable refrigerant flow (VRF) system and an odour control system as per the local building regulations requirement.   The ceiling void … Read More

CCPHVAC - Tottenham Court Rd Featured Image
Tottenham Court Rd, London

The Project An office upgrade on the Tottenham Court Rd, London. We were required to replaceĀ old R22 VRF systems with R410 units whilst retaining the existing pipework.   The Solution Due to the nature of the building replacing the pipework and the air conditioning units was not feasible. We removed … Read More

CCPHCAC - Case Study Featured
Pharmaceutical Warehouse

The Project   Our client moved into a new 45000 square foot warehouse with a requirement to keep the products they were manufacturing at a constant temperature.   Due to the height of the facility even air temperature was a potential issue. Our design team managed to get around this … Read More

CCPHVAC-Oliver Plaza Featured Image
Oliver Plaza, London

A boutique hotel in Earls Court The Oliver Plaza is a hotel in London. It has a total of 49 bedrooms, a reception and dining area. All of these areas required a new air-conditioning system being designed and installed. CCPHVAC installed a Mitsubishi heat recovery VRF system to serve the … Read More