CCPHCAC - Case Study Featured
Pharmaceutical Warehouse

The Project   Our client moved into a new 45000 square foot warehouse with a requirement to keep the products they were manufacturing at a constant temperature.   Due to the height of the facility even air temperature was a potential issue. Our design team managed to get around this … Read More

CCPHVAC-Oliver Plaza Featured Image
Oliver Plaza, London

A boutique hotel in Earls Court The Oliver Plaza is a hotel in London. It has a total of 49 bedrooms, a reception and dining area. All of these areas required a new air-conditioning system being designed and installed. CCPHVAC installed a Mitsubishi heat recovery VRF system to serve the … Read More

CCPHVAC - Itsu Oxford Featured
Itsu, Oxford

Design & Install a Bespoke Solution for Itsu The Problem To design and install air conditioning and refrigeration within a live shopping centre for one of our most regular clients, Itsu. We had to ensure that the works were completed with little disruption to the other tenants and members of … Read More

CCPHVAC R22 Kensington Featured Imaged
R22 Refrigeration Project

Reaching Government Regulations In A Grade II Listed Building The Problem Since 2008, CCP HVAC have been servicing and maintaining 32 air-conditioning units in South Kensington. The prestige nature of these apartments meant that the property owners expected a high level of performance and service from the units and from … Read More

CCPHVAC-Shetland Featured Image
Storage Component, Shetland

The problem To provide a constant temperature and ventilation system for a 3MWhr energy storage component within a PureWave┬« Storage Management System supplied by S&C Electric Europe Ltd accommodating over 3000 lead-acid batteries from Japan on a remote island location in Scotland. The challenges faced included contending with 90mph winds … Read More

CCPHVAC-Natural Kitchen Featured Image
Natural Kitchen

The Project A large restaurant and bar in central London The Solution The air conditioning supplied and installed was a Mitsubishi VRF heat recovery system over two floors. The condensers had to be stripped down and rebuilt on the 5thfloor. The ventilation works included the cook line canopies and due … Read More