Our Case Studies

At CCP HVAC we are experts in the supply, installation and maintenance of quality air conditioning and refrigeration equipment. We have a reputation for outstanding quality and service, which has seen us work across a variety of sectors on a range of projects. Each project is different, as are our clients. We have worked on advanced, residential installations for property developers, through to complex refrigeration solutions for Pret A Manger.

 

We truly thrive and enjoy each of the projects and systems we work on. They all provide us with an opportunity to work closely with clients to create or improve current systems. For example, we worked with S&C; Electric Europe LTD on a 3 Megawatt storage component on the Shetland Isles, which was a challenging location, but demonstrates the scenarios we work in to deliver top quality service and installations.

 

Our case studies below all demonstrate a particular wealth of knowledge and proficiency, especially in the food retail and cold storage industries, where we are market leaders thanks to our years of experience.

Pharmaceutical Warehouse

The Project   Our client moved into a new 45000 square foot warehouse with a requirement to keep the products they were manufacturing at a constant temperature.   Due to the height of the facility even air temperature was a potential issue. Our design team managed to get around this … Read More

Oliver Plaza, London

A boutique hotel in Earls Court The Oliver Plaza is a hotel in London. It has a total of 49 bedrooms, a reception and dining area. All of these areas required a new air-conditioning system being designed and installed. CCPHVAC installed a Mitsubishi heat recovery VRF system to serve the … Read More

Itsu, Oxford

Design & Install a Bespoke Solution for Itsu The Problem To design and install air conditioning and refrigeration within a live shopping centre for one of our most regular clients, Itsu. We had to ensure that the works were completed with little disruption to the other tenants and members of … Read More

R22 Refrigeration Project

Reaching Government Regulations In A Grade II Listed Building The Problem Since 2008, CCP HVAC have been servicing and maintaining 32 air-conditioning units in South Kensington. The prestige nature of these apartments meant that the property owners expected a high level of performance and service from the units and from … Read More

Storage Component, Shetland

The problem To provide a constant temperature and ventilation system for a 3MWhr energy storage component within a PureWave® Storage Management System supplied by S&C Electric Europe Ltd accommodating over 3000 lead-acid batteries from Japan on a remote island location in Scotland. The challenges faced included contending with 90mph winds … Read More

Natural Kitchen

The Project A large restaurant and bar in central London The Solution The air conditioning supplied and installed was a Mitsubishi VRF heat recovery system over two floors. The condensers had to be stripped down and rebuilt on the 5thfloor. The ventilation works included the cook line canopies and due … Read More

Itsu Head Office

A New Home for Itsu The Project Itsu were moving their entire operation to a new location and needed heating, cooling and refrigeration installed throughout The Solution A Mitsubishi heat recovery VRF system was installed to cover the open planned office and meeting rooms. The majority of the fan coils … Read More

Gail’s

The Project To install ventilation and extraction systems for the Artisan Bakery The Solution We installed a Toshiba twin split unit with two ducted indoor fan coils. Due to local residential apartments we designed and installed the ventilation to incorporate odour and noise control to comply with planning and avoid … Read More

Comptoir

The Project A restaurant with basement bar and wine cellar The Solution The air conditioning equipment was Toshiba cassettes. Then ventilation systems were designed to allow for the low ceilings in the basement and the restricted exit points of the building. The plant area had to be attenuated due to the … Read More

Wagamama, Bankside

A Solution for a land locked site The problem The site was land locked and there was no suitable outside spaces to install any  plant. This problem is quite common on city projects where available space is at a premium. The Solution We installed Hitachi internally mounted VRF condensing units … Read More

Belgravia Apartment

A Bespoke Solution For A Prestige Property The Problem Located on the 4th floor of a luxury apartment building, the owner at this sought after address required air-conditioning to provide cooling and heating throughout the property. When CCP HVAC began the project, there was no planning permission granted and there … Read More

Sardine

A Solution for a land locked site The Project A site in a residential area that required a high degree of odour control. The Plan CCPHVAC installed a Fujitsu ducted air conditioning system. We designed a canopy to cover the cook line that included a wood burning grill. We designed … Read More

Craft

A varied installation The Project A site with a wood burning Pizza Oven and Charcoal grill. The Plan The air conditioning was a Mitsubishi VRF heat pump system. CCPHVAC designed a water wash canopy to cover the cook line to comply with the local councils smoke emission criteria. CCPHVAC installed … Read More

Quality Service You Can Repeatidly Depend On